Facility Construction and Modification in Support of the Material Security and Consolidation ProjectCX(s) Applied: B1.15, B1.30Date: 01/27/2011Location(s): IdahoOffice(s): Nuclear Energy, Idaho Operations Office
K-Area Entrance Roadway ExpansionCX(s) Applied: B1.13Date: 01/26/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Repair a Leaking Duct Flange in F/H LabCX(s) Applied: B1.3Date: 01/26/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Missouri Biogas 1 -Hampton FeedlotCX(s) Applied: B5.1Date: 01/26/2011Location(s): Triplett, MissouriOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Magna E-Car Electric Drive System Components ManufacturingCX(s) Applied: A1, B1.24, B1.31Date: 01/26/2011Location(s): Grand Blanc, MichiganOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Rework Fire-rated Penetration Seal Per F-DCF-H-00591HB-Line Room 602A FloorCX(s) Applied: B2.2Date: 01/25/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
HB-Line Standpipe InstallationCX(s) Applied: B2.2Date: 01/25/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Wooden Pole Inspection/TreatmentCX(s) Applied: B1.3Date: 01/25/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Installation of Metering and Circuit Breaker at Powell 69-Kilovolt SubstationCX(s) Applied: B4.11Date: 01/25/2011Location(s): Page, ArizonaOffice(s): Western Area Power Administration-Colorado River Storage Project Management Center
Hex Block Shipment ProjectCX(s) Applied: B3.6Date: 01/25/2011Location(s): IdahoOffice(s): Nuclear Energy, Idaho Operations Office