Enhancement of SOFC Cathode Electrochemical Performance Using Multi-Phase Interfaces CX(s) Applied: A9 Date: 08/30/2012 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory
Roof Replacement and Fall Arrest System Installation CX(s) Applied: B1.15, B2.5 Date: 08/30/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Advanced Methane Hydrate Reservoir Modeling Using Rock Physics Techniques CX(s) Applied: A1, A9 Date: 08/30/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Pecan Street Smart Grid Extension Service CX(s) Applied: A9 Date: 08/30/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Optimization of Reservoir Storage Capacity in Different Depositional Environments (Champaign) CX(s) Applied: A9 Date: 08/30/2012 Location(s): Illinois Offices(s): National Energy Technology Laboratory
Optimization of Reservoir Storage Capacity in Different Depositional Environments (Rock Sampling) CX(s) Applied: B3.1 Date: 08/30/2012 Location(s): Multiple Offices(s): National Energy Technology Laboratory
Unraveling the Role of Transport, Electrocatalysis, and Surface Science in the SOFC Cathode ORR CX(s) Applied: B3.6 Date: 08/30/2012 Location(s): Multiple Offices(s): National Energy Technology Laboratory
Low Cost Hybrid Materials and Manufacturing for Conformable CNG Tanks CX(s) Applied: B3.6Date: 08/29/2012 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Dismantle/Remove Vacuum System and Related Equipment in 772-F CX(s) Applied: B1.3 Date: 08/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
284-H Track Coal Hopper Pit Modifications CX(s) Applied: B1.28 Date: 08/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office