Building 8 Compressor Aftercooler Rupture Disc Overflow Piping Project CX(s) Applied: B1.3, B1.15 Date: 05/09/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Reduction of Emissions and Thermal Inefficiencies with ClearSign Flame Control Technology CX(s) Applied: B3.6 Date: 05/09/2012 Location(s): North Dakota Offices(s): National Energy Technology Laboratory
2009 National Biodiesel Foundation Biofuel Infrastructure Project CX(s) Applied: B5.22 Date: 05/09/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Big Thompson to Flatiron 13.8 Kilovolt Transmission Line Structure Replacement CX(s) Applied: B1.3 Date: 05/09/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Archer to Ault 230 Kilovolt Transmission Line Structure Replacement, Weld County, Colorado CX(s) Applied: B1.3 Date: 05/09/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Western Area Power Administration and Tri-State Generation and Transmission Association, Inc. Fiber Optic Installation Project From Beaver Creek to Big Sandy Substations Morgan, Washington, and Lincoln Counties, Colorado CX(s) Applied: B1.3 Date: 05/0...
Information Operations & Research Center (IORC) Room E-6 Air Conditioner Unit Installation CX(s) Applied: B1.4 Date: 05/09/2012 Location(s): Idaho Offices(s): Idaho Operations Office
Clean, Seal, and Paint West Hackberry Buildings RW MCC 392, Substation 390 and MCC 317 CX(s) Applied: B1.3 Date: 05/08/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office