Pilot Power Group, Inc. Docket EA-383 CX(s) Applied: B4.2 Date: 05/18/2012 Location(s): California Offices(s): Electricity Delivery and Energy Reliability
Buried Power Line to 64-SX-3 CX(s) Applied: B1.3, B4.6, B4.12 Date: 05/17/2012 Location(s): Wyoming Offices(s): RMOTC
Acquisition of Specific Equipment to Enhance Performance, Control and Operational Capability of the University of Utah TRIGA Facilities CX(s) Applied: B2.2 Date: 05/17/2012 Location(s): Idaho Offices(s): Idaho Operations Office
A High Resolution Digital System in Support of Neutron Imaging at the PULSTAR Reactor – North Carolina State University CX(s) Applied: B3.6 Date: 05/17/2012 Location(s): Idaho Offices(s): Idaho Operations Office
Nuclear Instrumentation Upgrade for University of Missouri Research Reactor Power Level Monitoring – University of Missouri CX(s) Applied: B2.2 Date: 05/17/2012 Location(s): Idaho Offices(s): Idaho Operations Office
Upgrades to the Colorado School of Mines Neutron Imaging Beam-Line CX(s) Applied: B3.6 Date: 05/17/2012 Location(s): Idaho Offices(s): Idaho Operations Office
Radiation Detection and Nuclear Materials Laboratory Equipment in Support of Student Training and Research by the Department of Mechanical and Nuclear Engineering at Virginia Commonwealth University CX(s) Applied: B3.6 Date: 05/17/2012 Location(s): Id...
Reactor Power Up Rate, Compressor Replacement, Neutron Radiography Restore, Liquid Scintillation Counter – Texas Agricultural & Mechanical University CX(s) Applied: B2.2, B3.6 Date: 05/17/2012 Location(s): Idaho Offices(s): Idaho Operations Office
Relocation of Wood Poles on Centralia B Street No. 1 for Proposed Centralia City Light May Street Substation CX(s) Applied: B4.6 Date: 05/17/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Energy Efficiency and Conservation Block Grant Franklyn Park Apartments; North Saint Paul CX(s) Applied: A9, B5.19 Date: 05/17/2012 Location(s): Minnesota Offices(s): Golden Field Office