Establish Laydown Yard Northeast of MOX Services Concrete Batch Plant CX(s) Applied: B1.15 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Construction of a Metal Carport Structure CX(s) Applied: B1.15 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Establish Laydown Yard East of 281-3F CX(s) Applied: B1.15 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
One Nevada Optimization of Microwave Telecommunication System CX(s) Applied: B1.19, B4.6 Date: 05/29/2012 Location(s): Nevada, Offices(s): Loan Guarantee Program Office
Excavate to Repair Underground Domestic Water Leak between Tanks 5 and 7 CX(s) Applied: B1.3 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Operation and Maintenance of Inductively Coupled Plasma Mass Spectrometry Method in 773, B142 CX(s) Applied: B3.6 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Analysis of Organic Species by Gas Chromatography (GC) and Gas Chromatography/Mass Spectrometry (GC/MS) CX(s) Applied: B3.6 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
High Pressure Fire Loop and Lead-In Replacement in the MAA - Amendment 01 CX(s) Applied: B5.4 Date: 05/29/2012 Location(s): Texas Offices(s): Pantex Site Office
Infrastructure for Advanced Reactor Materials Center CX(s) Applied: B2.2 Date: 05/28/2012 Location(s): Idaho Offices(s): Idaho Operations Office
H-Canyon Dissolver Corrosion Rate Assessment CX(s) Applied: B3.6 Date: 05/25/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office