Compressed Natural Gas Manufacturing CX(s) Applied: B5.1 Date: 10/26/2011 Location(s): Wisconsin Offices(s): Golden Field Office
Enabling Earth·Abundant Pyrite (FeS2) Semiconductor Nanostructures for High Performance Photovoltaic Devices CX(s) Applied: B3.6 Date: 10/26/2011 Location(s): Wisconsin Offices(s): Golden Field Office
National Offshore Wind Energy Grid Interconnection Study CX(s) Applied: A9 Date: 10/26/2011 Location(s): North Carolina Offices(s): Golden Field Office
Heron Wind Manufacturing CX(s) Applied: B3.6, B5.1 Date: 10/26/2011 Location(s): Michigan Offices(s): Golden Field Office
Intermediate Bandgap Solar Cells from Nanostructured Silicon CX(s) Applied: B3.6 Date: 10/26/2011 Location(s): Massachusetts Offices(s): Golden Field Office
Solar Upconversion with Plasmon-Enhanced Bimolecular Complexes CX(s) Applied: B3.6 Date: 10/26/2011 Location(s): California Offices(s): Golden Field Office
Replace Degraded Chemical Hood Exhaust Duct in 735-A, D-wing Service Floor CX(s) Applied: B2.3 Date: 10/25/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Edible Oil Deployment for Enhanced Chlorinated Volatile Organic Compounds Attenuation at the M Area Abandoned Process Sewer Line CX(s) Applied: B3.1 Date: 10/25/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Hydroelectric Power Rate Increase for the Integrated System of Hydropower Projects CX(s) Applied: B4.3 Date: 10/20/2011 Location(s): CX: none Offices(s): Southwestern Power Administration
Repair of Fire Water Line Near 254-13F CX(s) Applied: B1.3 Date: 10/20/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office