Safety Environmental Improvements 300 Area CX(s) Applied: B2.5 Date: 08/01/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Cutters Grove, Anoka CX(s) Applied: A9, B5.19 Date: 07/31/2012 Location(s): Minnesota Offices(s): Golden Field Office
Massachusetts-City-Malden CX(s) Applied: A9, A11, B1.32, B5.1 Date: 07/31/2012 Location(s): Massachusetts Offices(s): Energy Efficiency and Renewable Energy
Colorado-County-Douglas CX(s) Applied: A1, A9, A11, B1.32, B5.1 Date: 07/31/2012 Location(s): Colorado Offices(s): Energy Efficiency and Renewable Energy
Pilot Butte-La Pine No. 1 Wood Pole Replacement Project CX(s) Applied: B4.6 Date: 07/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Bonneville Power Administration/Washington Department of Natural Resources Access Road Improvements CX(s) Applied: B1.3 Date: 07/30/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration
Montrose Operations Center Asphalt Overlay Project CX(s) Applied: B1.3 Date: 07/30/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Line Switch Replacements at Guernsey Rural, Worland, Refinery, Box Butte, and Morrill Taps CX(s) Applied: B4.6, B4.11 Date: 07/30/2012 Location(s): Wyoming, Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region
Hydroelectric Power Rate Increase for the Robert Douglas Willis Hydropower Project CX(s) Applied: B4.3 Date: 07/30/2012 Location(s): Texas, Texas, Texas Offices(s): Southwestern Power Administration
Four AT&T Wireless Communication Site Upgrades CX(s) Applied: B1.7, B1.19 Date: 07/27/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration