Routine and Proposed Actions at the Riverton, Wyoming, Processing Site CX(s) Applied: B1.3, B3.1 Date: 01/12/2012 Location(s): Wyoming Offices(s): Legacy Management
Arkansas-County-Pope CX(s) Applied: B2.5, B5.1 Date: 01/12/2012 Location(s): Arkansas Offices(s): Energy Efficiency and Renewable Energy
Development of Mooring-Anchor Program in Public Domain for Coupling with Floater Program for Floating Offshore Wind Turbines CX(s) Applied: A9 Date: 01/11/2012 Location(s): Texas Offices(s): Golden Field Office
Development of Mooring-Anchor Program in Public Domain for Coupling with Floater Program for Floating Offshore Wind Turbines CX(s) Applied: A9 Date: 01/11/2012 Location(s): Texas Offices(s): Golden Field Office
Integration of the Farm Power Misty Meadows Generating Facility CX(s) Applied: B1.7 Date: 01/11/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Washington River Protection Solutions LLC - Proposed Actions For Calendar Year 2012 Scheduled To Take Place CX(s) Applied: B1.23 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Enhanced Geothermal Systems- Concept Testing and Development at the Raft River Geothermal Field, Idaho CX(s) Applied: A9, B3.1 Date: 01/10/2012 Location(s): Idaho Offices(s): Golden Field Office
Offshore 12 Megawatt Turbine Rotor With Advanced Material and Passive Design Concept CX(s) Applied: A9 Date: 01/10/2012 Location(s): Colorado Offices(s): Golden Field Office
Chemical Vapor Deposition - Based Valence-Mending Passivation for Crystalline-Silicon Solar Cells CX(s) Applied: A9, B3.6 Date: 01/10/2012 Location(s): Arizona Offices(s): Golden Field Office
Kearney - Waste Water Treatment Plant CX(s) Applied: B5.1 Date: 01/10/2012 Location(s): Missouri Offices(s): Golden Field Office