Renewable Energy Research and Development: Entrepreneur-In-Residence Education Program (John Argo) CX(s) Applied: A9, A11 Date: 01/19/2012 Location(s): Nevada Offices(s): Golden Field Office
Heat Exchanger Removal and Disposition CX(s) Applied: B1.23 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Fire Suppression System Modifications, 772-1F CX(s) Applied: B2.5 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Modify Tank Return Header to Provide Hose Connection CX(s) Applied: B1.3 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Demolition of Building 250-2S CX(s) Applied: B1.23 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replace Trailer Space Roll Door North Side Purification CX(s) Applied: B1.3 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Dynamic Mechanical Testing with Battery Electrolyte in Savannah River National Laboratory Designed Sample Holders CX(s) Applied: B3.6 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Scaled Saltstone Mixer Commissioning CX(s) Applied: B3.6 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Investigating Marine Boundary Layer Parameterizations by Combining Observations with Models Via State Estimation CX(s) Applied: A9 Date: 01/18/2012 Location(s): Colorado Offices(s): Golden Field Office
General Motors Battery Pack Assembly Plant - Electric Substation Upgrade CX(s) Applied: A9, A11 Date: 01/18/2012 Location(s): Michigan Offices(s): National Energy Technology Laboratory