Black Hills State Heating and Cooling Plant CX(s) Applied: B1.15, B1.23, B2.2, B5.1, B5.2, B5.4 Date: 06/13/2012 Location(s): South Dakota Offices(s): National Energy Technology Laboratory
Fermilab Muon Campus, including Muon to Electron Conversion Experiment and the MC-1 Building CX(s) Applied: B1.15, B3.10 Date: 06/12/2012 Location(s): Illinois Offices(s): Fermi Site Office
Natapoc Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Old Highway Bridge Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Poorman Ponds Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Sale of Line Mile 1 of the 115 Kilovolt (kV) Tanner Tap to Snoqualmie-Lake Tradition #1 Transmission Line CX(s) Applied: B1.24 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Power Circuit Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/12/2012 Location(s): Washington, Oregon, Idaho, Montana, Wyoming Offices(s): Bonneville Power Administration
High Efficiency Structural Flowthrough Rotor With Active Flap Control CX(s) Applied: A9 Date: 06/12/2012 Location(s): California Offices(s): Golden Field Office
Ultra-Deepwater Riser Concepts for High Motion Vessels CX(s) Applied: A9 Date: 06/12/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Compressed Natural Gas Fueling Facility CX(s) Applied: A1 Date: 06/12/2012 Location(s): Missouri Offices(s): National Energy Technology Laboratory