High Resolution 3D Laser Imaging for Inspection, Maintenance, Repair and Operations - Phase II CX(s) Applied: A9, B3.6 Date: 08/29/2012 Location(s): Colorado Offices(s): National Energy Technology Laboratory
(0675-1536) Oak Ridge National Laboratory -Temperature Self-Regulation for Large Format Li-ion Cells CX(s) Applied: B3.6 Date: 08/29/2012 Location(s): Tennessee, California Offices(s): Advanced Research Projects Agency-Energy
An Advanced Joint Inversion System for Carbon Dioxide Storage Modeling with Large Data Sets for Characterization CX(s) Applied: A1, A9 Date: 08/29/2012 Location(s): California Offices(s): National Energy Technology Laboratory
SRI International- Container-less Natural Gas Storage CX(s) Applied: B3.6 Date: 08/29/2012 Location(s): California Offices(s): Advanced Research Projects Agency-Energy
Pittsburgh B83 Boiler Room Ventilation/Cooling Project CX(s) Applied: B2.1, B2.2, B2.3 Date: 08/29/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
State Energy Program Annual Program Year 2012 (Fiscal Year 2013) CX(s) Applied: A9, A11, B5.1 Date: 08/29/2012 Location(s): Alabama Offices(s): Golden Field Office
Hydrogen Fuel-Cell Electric Hybrid Truck Demonstration CX(s) Applied: B2.1, B5.1, B5.22 Date: 08/29/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Field Test and Evaluation of Engineered Biomineralization Technology for Sealing Existing Wells CX(s) Applied: B3.6, B3.11 Date: 08/29/2012 Location(s): Alabama Offices(s): National Energy Technology Laboratory
Field Test and Evaluation of Engineered Biomineralization Technology for Sealing Existing Wells CX(s) Applied: B3.6 Date: 08/29/2012 Location(s): Montana Offices(s): National Energy Technology Laboratory
Housatonic River Net-Zero-Energy Building at Berkshire Museum CX(s) Applied: B5.1 Date: 08/29/2012 Location(s): Massachusetts Offices(s): National Energy Technology Laboratory