Development of a New Generation High-Temperature Superconducting Composite Conductor Delivered at $20/(kA m) with Low AC Loss CX(s) Applied: B3.6Date: 01/30/2013 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Development of Novel Carbon Sorbents for Carbon Dioxide Capture CX(s) Applied: B3.6 Date: 01/30/2013 Location(s): Alabama Offices(s): National Energy Technology Laboratory
Petrophysics/Tight Rock Characterization for Improved Stimulation and Production Technology in Shales CX(s) Applied: A9, B3.6 Date: 01/30/2013 Location(s): Alabama Offices(s): National Energy Technology Laboratory
Petrophysics/Tight Rock Characterization for Improved Stimulation and Production Technology in Shales CX(s) Applied: A9, B3.6 Date: 01/30/2013 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory
Petrophysics/Tight Rock Characterization for Improved Stimulation and Production Technology in Shales CX(s) Applied: A9, B3.6 Date: 01/30/2013 Location(s): Alabama Offices(s): National Energy Technology Laboratory
Installation of Retail Biofuel Infrastructure Supporting I-75 Green Corridor Project CX(s) Applied: A1, B5.22 Date: 01/30/2013 Location(s): Florida Offices(s): National Energy Technology Laboratory
Demonstration of Multipollutant Reduction using a Lextran 3-in-1 Wet Scrubber CX(s) Applied: A9, B3.6 Date: 01/30/2013 Location(s): North Dakota Offices(s): National Energy Technology Laboratory
Eugene Substation Protective Relay Installation CX(s) Applied: B1.7 Date: 01/29/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
L-Area River Water Valve V-022 Bypass and Piping CX(s) Applied: B1.3 Date: 01/29/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Fuel Cell Powered Airport Ground Support Equipment Deployment CX(s) Applied: A9, B5.1, B5.22 Date: 01/29/2013 Location(s): New York Offices(s): Golden Field Office