Electronic Equipment Upgrades and Emergency Generator Replacements CX(s) Applied: B1.7 Date: 04/12/2013 Location(s): CX: none Offices(s): Bonneville Power Administration
Brasada-Harney No. 1 Wood Pole Replacement Project CX(s) Applied: B1.3 Date: 04/12/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration
Pacific Northwest National Laboratory- Genset Heat Recovery Adsorption Chiller for Navy Forward Operations Bases CX(s) Applied: B3.6 Date: 04/11/2013 Location(s): Washington, Oregon, Georgia Offices(s): Advanced Research Projects Agency-Energy
Broken Link: Table Mountain Rancheria of California Tribe Proposes Energy Use Study As Well As Heating and Cooling Install/Replace CX(s) Applied: CX: none Date: CX: none Location(s): California Offices(s): Energy Efficiency and Renewable Energy
F-08 Outfall Access Improvement CX(s) Applied: B3.1 Date: 04/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Thermogravimetric/Differential Scanning Calorimetric Measurements of Solid Materials CX(s) Applied: B3.6 Date: 04/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
B903 Renovation CX(s) Applied: B1.16, B1.29, B2.1, B2.5 Date: 04/10/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Kesselring Site K&L Load Center Relocation Project CX(s) Applied: B1.15 Date: 04/10/2013 Location(s): New York Offices(s): Naval Nuclear Propulsion Program
Dissolution of Sludge Constituents in Glycolate-containing 2H Evaporator Rad Feed Solution CX(s) Applied: B3.6 Date: 04/10/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
X-ray Diffraction Laboratory Operations CX(s) Applied: B3.6 Date: 04/10/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office