Robust Metal-Ceramic Coaxial Cable Sensors for Distributed Temperature Monitoring in Fossil Energy CX(s) Applied: B3.6 Date: 05/30/2014 Location(s): South Carolina Offices(s): National Energy Technology Laboratory
Subcontractor Repair of Roof Leaks at 221-H (Truckwell Airlock) CX(s) Applied: B1.3 Date: 05/29/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Reliability of Annular Pressure Buildup (APB) Mitigation Technologies CX(s) Applied: A9, A11 Date: 05/29/2014 Location(s): Minnesota Offices(s): National Energy Technology Laboratory
A Hybrid Catalytic Route to Fuels from Biomass Syngas CX(s) Applied: B3.6 Date: 05/29/2014 Location(s): Georgia, Illinois Offices(s): Golden Field Office
Hawaii National Renewable Marine Energy Center CX(s) Applied: B5.25 Date: 05/29/2014 Location(s): Hawaii Offices(s): Golden Field Office
Hawaii Renewable Energy Development Venture CX(s) Applied: A9, B5.1 Date: 05/29/2014 Location(s): Hawaii, Hawaii Offices(s): Golden Field Office
Pressure Prediction and Hazard Avoidance Through Improved Seismic Imaging CX(s) Applied: A1, A9, A11 Date: 05/29/2014 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory
Pressure Prediction and Hazard Avoidance Through Improved Seismic Imaging CX(s) Applied: A1, A9, A11 Date: 05/29/2014 Location(s): Massachusetts Offices(s): National Energy Technology Laboratory
I-75 Green Corridor Project CX(s) Applied: B5.22 Date: 05/28/2014 Location(s): Tennessee Offices(s): National Energy Technology Laboratory
Longview-Cowlitz Fiber Optic Cable Upgrade CX(s) Applied: B4.7 Date: 05/28/2014 Location(s): Washington Offices(s): Bonneville Power Administration