Big Hill Site Building Upgrades, Phase 2 CX(s) Applied: B1.3Date: 08/10/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Forest Grove-McMinnville Wood Pole Replacement Projects CX(s) Applied: B1.3Date: 08/10/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Albany Substation Control House Floor Replacement CX(s) Applied: B1.3Date: 08/10/2015 Location(s): OregonOffices(s): Bonneville Power Administration
785-6A Outside Painting Exterior Equipment and Safety Items CX(s) Applied: B1.3Date: 08/07/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Blythe-Headgate Rock X-Brace Replacement CX(s) Applied: B1.3Date: 08/07/2015 Location(s): CaliforniaOffices(s): Western Area Power Administration-Desert Southwest Region
Parker Dam Pole Replacement CX(s) Applied: B1.3Date: 08/07/2015 Location(s): CaliforniaOffices(s): Western Area Power Administration-Desert Southwest Region
Blythe-Knob 161 Kilovolt Transmission Line, Pole Replacements at Interstate 10 Crossing CX(s) Applied: B1.3Date: 08/07/2015 Location(s): CaliforniaOffices(s): Western Area Power Administration-Desert Southwest Region
Low-Cost, Efficient, and Durable High Temperature Wireless Sensors by Direct Write Additive Manufacturing for Application in Fossil Energy Systems CX(s) Applied: B3.6Date: 08/07/2015 Location(s): WashingtonOffices(s): National Energy Technology Laboratory
Assessment of Carbon Dioxide Storage Resources in Depleted Oil and Gas Fields in the Ship Shoal Area, Gulf of Mexico CX(s) Applied: A9Date: 08/07/2015 Location(s): CaliforniaOffices(s): National Energy Technology Laboratory
Timber Tap Wood Pole Replacement Project 2015 CX(s) Applied: B1.3Date: 08/07/2015 Location(s): OregonOffices(s): Bonneville Power Administration