730-1B and 730-4B Roof Replacement CX(s) Applied: B1.3Date: 01/29/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
MOX Services Use of 83 Acres for Storage and Staging of Construction Materials CX(s) Applied: B1.15Date: 01/29/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 731-2N CX(s) Applied: B1.3Date: 01/29/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Repair Roof Drain Down Spout CX(s) Applied: B1.3Date: 01/29/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Proposed Rulemaking Regarding the Energy Conservation Standards for Residential and Commercial Water Heaters RIN: 1904-AC-91 CX(s) Applied: A5 EERE- Buildings Technology Program Date: 01/29/2015 Location(s): Nationwide Office(s): Golden Field...
Box Butte-Snake Creek 115 Kilovolt Transmission Line Structure Replacements Box Butte County, NE CX(s) Applied: B1.3Date: 01/29/2015 Location(s): NebraskaOffices(s): Western Area Power Administration-Rocky Mountain Region
Co-Generation of Fuels During Copper Bioleaching CX(s) Applied: B3.6Date: 01/28/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Continuous Membrane Assisted IBE fermentation from AVAP(R) Sugars Award Number: DE-EE0006879 CX(s) Applied: A9, B3.6 Bioenergy Technologies Office Date: 01/28/2015 Location(s): GA Office(s): Golden Field Office
Kalispell Maintenance Headquarters Upgrades CX(s) Applied: B1.3Date: 01/28/2015 Location(s): MontanaOffices(s): Bonneville Power Administration
Maupin-Tygh Valley Transmission Line Rebuild CX(s) Applied: B4.10Date: 01/28/2015 Location(s): OregonOffices(s): Bonneville Power Administration