Scientific Research Related to the Predictive Science Strategic Academic Alliances Program II (PSAAP) at University of California, Santa Barbara CX(s) Applied: A1, A9, B3.6Date: 10/19/2015 Location(s): CaliforniaOffices(s): NNSA-Headquarters
Reducing Soft Costs through Hardware Innovation - Phase II Award Number: DE- EE-0007199 CX(s) Applied: A9, B3.6 Solar Energy Technologies Office Date: 10/19/2015 Location(s): HI Office(s): Golden Field Office
Free Piston Stirling Engine Based 1kW Generator CX(s) Applied: B3.6Date: 10/16/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Sustainable Economic mCHP Stirling (SEmS) Generator CX(s) Applied: B3.6Date: 10/16/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Elverta Washrack, Paving, and Drainage Repair CX(s) Applied: B4.6Date: 10/16/2015 Location(s): CaliforniaOffices(s): Western Area Power Administration-Sierra Nevada Region
Commercial Truck Transmission-Integrated Utility-Grade Power Generation from Natural Gas CX(s) Applied: B3.6Date: 10/16/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Demolish Eight Temporary, Modular Structures at the Old Agent Operations Western Command and Build a New Building CX(s) Applied: B1.15, B1.23Date: 10/16/2015 Location(s): New MexicoOffices(s): NNSA-Headquarters
Synthesis and Gold-loading of Nanosized Monosodium Titanate CX(s) Applied: B3.6Date: 10/16/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Single-Cylinder Two-Stroke Free-Piston Internal Combustion Generator CX(s) Applied: B3.6Date: 10/15/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Central Arizona Project Rate Increase CX(s) Applied: B1.1Date: 10/15/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region