LURR 20140313 City of Vancouver Sewer Lateral CX(s) Applied: B4.9Date: 41906 Location(s): WashingtonOffices(s): Bonneville Power Administration
LURR 20140504 Ross Substation Comcast Fiber Installation CX(s) Applied: B4.9Date: 41906 Location(s): WashingtonOffices(s): Bonneville Power Administration
Action Substation Equipment Sale CX(s) Applied: B1.24Date: 41906 Location(s): OregonOffices(s): Bonneville Power Administration
Building 440 CNM Clean Room Expansion CX(s) Applied: B3.15Date: 41906 Location(s): IllinoisOffices(s): Argonne Site Office
Unobtrusive Multi-static Serial LiDAR Imager (UMSLI) for Wide-area Surveillance and Identificaiton of Marine Life at MHK Installations Award: DE-EE0006787 CX(s) Applied: A9, B3.6 Water Power Program Date: 09/23/2014 Location(s): Florida Office(s): G...
Borehole-Deployed Electric Field Sources and Sensors for Permanent Monitoring of Carbon Dioxide Sequestration CX(s) Applied: B3.1, B3.6Date: 41905 Location(s): IllinoisOffices(s): Chicago Office
Qualifying EGS Reservoir Complexity with an Integrated Geophysical Approach-Improved Resolution Ambient Seismic Noise Interferometry Award: DE-EE0006767 CX(s) Applied: A9, Geothermal Technologies Office Date: 09/23/2014 Location(s): Nevada Office(s)...
NeoGrowth Silicon: US Manufacturing of Solar Wafers Award: DE-EE0006806 CX(s) Applied: A9, B3.6 Solar Energy Technologies Office Date: 09/23/2014 Location(s): Oregon Office(s): Golden Field Office
Bench-Scale Development of a Non-Aqueous Solvent Carbon Dioxide Capture Process CX(s) Applied: B3.6 Date: 09/11/2014 Location(s): Norway Offices(s): National Energy Technology Laboratory
St. Johns-Keeler Minor Access Road Improvement CX(s) Applied: B1.3Date: 41901 Location(s): OregonOffices(s): Bonneville Power Administration