Subcontractor Will Provide Roof Repairs at 218-H CX(s) Applied: B1.3Date: 07/27/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Various Getter Testing for SRNL / Defense Programs Technology (DPT/HPG) CX(s) Applied: B3.6Date: 07/27/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Radioactive Simulant Tests for Office of River Protection CX(s) Applied: B3.6Date: 07/27/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Construct Concrete Cover Over TRU Pad 16 (660-16E) CX(s) Applied: B6.1Date: 07/27/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Low-Energy Water Recovery from Subsurface Brines CX(s) Applied: B3.6Date: 07/27/2015 Location(s): North CarolinaOffices(s): National Energy Technology Laboratory
Passive Wireless Sensors Fabricated by Direct-Writing for Temperature and Health CX(s) Applied: B3.6Date: 07/27/2015 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
Environmental Cracking and Irradiation Resistant Stainless Steel by Additive Manufacturing - General Electric Company, GE Global Research CX(s) Applied: B3.6, B3.10Date: 07/27/2015 Location(s): IdahoOffices(s): Nuclear Energy
Subcontractor Will Provide Roof Repairs at 218-1H CX(s) Applied: B1.3Date: 07/27/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Spherically Imploding Plasma Liners as a Standoff Magneto-Inertial-Fusion Driver CX(s) Applied: B3.6Date: 07/27/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy