Well Abandonment CX(s) Applied: B3.1Date: 02/04/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Relocate Buildings 183-5K and 183-6K to H-Area CX(s) Applied: B1.22Date: 02/04/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
A-Area Trailer and Handy House Demolition and Removal CX(s) Applied: B1.23Date: 02/04/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Deumling/Zena Stewardship Funding CX(s) Applied: B1.20Date: 02/04/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Alstom Grid Commercial Microgrid Design Development and Testing for PIDC and PWD System CX(s) Applied: A1, A9, A11, B3.6, B4.4, B5.15Date: 02/04/2015 Location(s): WashingtonOffices(s): National Energy Technology Laboratory
Fully and Intricately Conformable, Single-Piece, Mass-Manufacturable High-Pressure Gas Storage Tanks CX(s) Applied: B5.15Date: 02/04/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Process Demonstration Unit Support Structure CX(s) Applied: B1.15Date: 02/04/2015 Location(s): IdahoOffices(s): Idaho Operations Office
Danger Tree Management on Upper Molina Lower Molina 115 Kilovolt Transmission Line Structure 34 Mesa County, CO CX(s) Applied: B1.3Date: 02/04/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region
Annual Firefighter Hazardous Materials Training CX(s) Applied: B1.2Date: 02/03/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Repair Roof Drain Down Spout CX(s) Applied: B1.3Date: 02/03/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office