Subcontractor Will Provide Roof Repairs at 701-2K CX(s) Applied: B1.3Date: 11/23/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
      Replace Steam Line Pole L-2  CX(s) Applied: B1.3Date: 11/23/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
      Hydrate Modeling & Flow Loop Experiments for Water Continuous and Dispersed Systems CX(s) Applied: B3.6Date: 11/23/2015 Location(s): ColoradoOffices(s): National Energy Technology Laboratory
      Cinder Cones Property Acquisition Funding CX(s) Applied: B1.25Date: 11/23/2015 Location(s): IdahoOffices(s): Bonneville Power Administration
      Robert Douglas Willis Hydropower Project Hydroelectric Power Rate Increase CX(s) Applied: B4.3Date: 11/20/2015 Location(s): OklahomaOffices(s): Southwestern Power Administration
      General Chemical Support Operations for NHS, HP  CX(s) Applied: B3.6Date: 11/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
      Synthesis and Modification of Zeolites and Zeolite-type Materials  CX(s) Applied: B3.6Date: 11/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
      Nuclear Non-destructive Assay  CX(s) Applied: B3.6Date: 11/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
      H-Area E3S Replacement & Argus Implementation  CX(s) Applied: B2.2Date: 11/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
      Subcontractor Will Provide Roof Repairs at 703-H  CX(s) Applied: B1.3Date: 11/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office