Integrated Waste Treatment Unit (IWTU) Steam Reformer CX(s) Applied: B3.6Date: 04/19/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Fiscal Year 2016 Wood Pole Replacement – Grand Coulee Transmission Line Maintenace CX(s) Applied: B1.3Date: 04/19/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Categorical Exclusion Determination
Categorical Exclusion Determination
Shiprock Substation Stormwater Erosion Control Maintenance San Juan County CX(s) Applied: B1.33Date: 04/18/2016 Location(s): New MexicoOffices(s): Western Area Power Administration-Rocky Mountain Region
Addy-Cusick No. 1 Mile 20 to 22 Road Improvement & Ford Construction CX(s) Applied: B1.3Date: 04/18/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Radiological Evidence Examination Facility (REEF) Evidence Examinations CX(s) Applied: B3.6Date: 04/15/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Laboratory Kd Measurement of Non-contaminated Nanoparticles and RAD Spiked Solutions CX(s) Applied: B3.6Date: 04/15/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Fairview-Bandon No. 1 Span 12/2 Impairment Remedy CX(s) Applied: B1.3Date: 04/15/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Materials and Fuels Complex Hot Fuel Examination Facility Purification System Modernization CX(s) Applied: B2.2Date: 42474 Location(s): IdahoOffices(s): Nuclear Energy