Replace a double door slab on trailer/shed 723-L.…
Handrails, anchorbolts and baseplates around L-Area (exterior) will be repainted to stop rusting.…
Herbicide applications in Solid Waste Management Facilities and F-Area.…
Bonneville Power Administration (BPA) proposes to remedy impairments and install shunts in multiple locations along the South Elma-Satsop Park No. …
Bonneville Power Administration (BPA) proposes to fund the Nez Perce Tribe (NPT) to outplant salmon carcasses in the Crooked River on federal land …
New substation, Electric Line, and Pole Replacement…
4.2 C is field work related to collection of seismic data. 4.2 D is processing of seismic data. 4.5 Baseline data collection- targeted water sample…
The activities that are covered in this initial categorical exclusion NEPA determination are consistent with the activities under milestones 1.1 th…
The U.S. Department of Energy (DOE) is proposing to provide funding to the City of Grand Junction to install a 116.13-kilowatt solar array to the r…
Installation of a microgrid at the Carlson Power Plant and JBPU distro system. Equipment such as battery storage, controls, relaying, electric veh…