Recirculation Well SSR-001 Modification CX(s) Applied: B3.1Date: 07/26/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 703-H CX(s) Applied: B1.3Date: 07/26/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
233-H Room 11 Modification for Direct Disposal CX(s) Applied: B2.2Date: 07/26/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
KAC Disassembly Transfer Bay Floor Upgrade CX(s) Applied: B1.15, B2.1Date: 07/26/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Thermogravimetric Analysis and Mass Spectrometer in SRNL GB-49 CX(s) Applied: B3.6Date: 07/26/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Conduct Roof Repairs at 735-A CX(s) Applied: B1.3Date: 07/26/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Installation of Retrofit Refrigerant CX(s) Applied: B1.3Date: 07/26/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Estes - Mary's Lake East and West 115-kilovolt Transmission Line Vegetation Task Order Number 115 Larimer County, Colorado CX(s) Applied: B1.3Date: 07/26/2016 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Powder, Aggregate, and Sample Residue Generation CX(s) Applied: B3.6Date: 07/26/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Site Characterization, Monitoring, and General Research Activities for Pantex Plant for FY2017 and FY2018 CX(s) Applied: B3.1, B3.3, B3.6, B3.8Date: 07/26/2016 Location(s): TexasOffices(s): Pantex Site Office