Categorical Exclusion (CX) Determinations By Date

Building 94 Removal/Replacement of Concrete Slabs Over West Side Air Shaft CX(s) Applied: B1.3Date: 08/04/2016 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
A Nonconventional Carbon Dioxide-Enhanced Oil Recovery (EOR) Target in the Illinois Basin CX(s) Applied: A9, B3.1Date: 08/04/2016 Location(s): IllinoisOffices(s): National Energy Technology Laboratory
Materials and Fuels Complex (MFC)-752 Analytical Laboratory Installation of Air Conditioning Units CX(s) Applied: B2.1Date: 08/04/2016 Location(s): IdahoOffices(s): Nuclear Energy
Bridgeport - Sidney 115-kilovolt Transmission Line, Replacement of Structure 120, Cheyenne County, Nebraska, Project Number 2016-153 CX(s) Applied: B1.3Date: 08/03/2016 Location(s): NebraskaOffices(s): Western Area Power Administration-Rocky Mountain R...