Revision 2: Revise the summary, detailed description and activity end date of this EEC based on Revision 1 of MT-TRI-2020-0014. Also, add two refer…
The training mockup glovebox located in 705-H is no longer needed. The glovebox will be disassembled and transported to 221-12F for storage.…
New quonset structures and covers will be installed for 263-283H and 263-284H.…
Demolition of Trailers in K-Area…
Drain lead acid batteries located at the Transformer Laydown Yard at 622-N.…
716-N Install the new HCRS-4P hydraulic cylinder repair stand.…
Repair the restroom walls at 703-10B per Acknowledgement of Scope.…
This revised EEC expands the original Tim's Branch uranium transport project EEC to provide greater detail of all wetland biogeochemistry studies p…
This testing conditions the celotex cane fiberboard and foam material for mechanical and thermal testing in several environments.…
This EEC covers various general renovation activities for Building 773-41A. Scope includes D and R such as replacing sink, associated piping and el…