The number of employees at the Materials and Fuels Complex has increased and the facility needs additional office space. The proposed action leases…
The proposed action installs a new metal stud wall with gypsum board on one side, vinyl faced fiberglass blanket insulation, new wall passage with …
The purpose of this revision is to document a change to the seismic borehole location near the Advanced Test Reactor Complex. Two alternative sites…
CX(s) Applied: B5.1 Building Technologies OfficeLocation(s): NationwideOffice(s): Golden Field Office
The dial room at the Specific Manufacturing Capability in building Test Area North-601 lacks a fire suppression system. The proposed action designs…
Remove and replace water damaged flooring and wall coverings. Repair the north interior door. Seal the roof of the trailer by applying a seal coat.…
The back panel from Structure 660-20E will be removed and placed on another structure located nearby. The remaining Structure 660-20E (metal framin…