At the Scrap Lumber Pile 631-2G a DPT rig will collect soil samples to a depth of 10-ft at 19 locations. At the Ford Building (690-N) 27 hand aug…
Remove insulation from valve 806, so that packing can be adjusted. Valve is located in front of 736-A, SRNL.…
The existing cubicles are original to the 730-B facility and have reached the end of their design life and will be replaced.…
A Storm Water Visual Assessment Sample Holder (a.k.a Kremlin sleeve) is to be installed at outfall S-10A. …
Replace wooden steam line support brackets with steel brackets in various locations in A-Area.…
CX-020017: K-Area Electronic Safeguards and Security System (E3S) Replacement & Argus Implementation
This modification will replace E3S in K-Area with the Lawrence-Livermore National Laboratory (LLNL) Argus Security System.…
Remove Ductwork in Front of Chiller Unit 004 in Building 785-6A. Subcontractor will repair/rebuild the Chiller Unit and replace ductwork.…
Boiler preventive and corrective maintenance (PM/CM) on 735-1B Hot Water System, including removal of presumed asbestos containing material (PACM) …
The proposed action is to fully remove the existing roof system on building 292-F, Fan House, down to the existing metal deck and replace it. …
Transport, Receipt, and Unloading of Samples from VC Summer. Rev. 2 Added returning samples to glass vials, where the vials will be subsampled usi…