Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Blue River-Gore …
Southwestern Power Administration proposes to modify existing ground grid, add additional stone to substation paving, provide drainage improvements…
Award Number: DE-EE0008752, CX(s) Applied: A9, B3.6, B3.15, Solar Energy Technologies Office, Location(s): KY, Office(s): Golden Field Office
Award Number: DE-EE0008630, CX(s) Applied: A9, B3.6, Water Power Technologies Office, Location(s): TX, Office(s): Golden Field Office
BPA proposes to remove the outdated control house at Maupin Substation to accommodate additional equipment to meet future needs. Equipment used to …
BPA proposes to sell Norway Substation to Coos-Curry Electrical Cooperative. The property is comprised of 1.32 acres of BPA fee-owned land. CoosCur…
The project will perform LIBS experiments
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O&M Plan is not required. These exca…
This scope of work is to remove any existing material from the three specified expansion joints—one of which lacks any sealant and is cracking—and …
Adding additional grab ports to the MS3 grab sample manifold.…