Develop a cost-effective quality assurance (QA) method that can rapidly laser powder fusion (LPBF) additive manufacturing (AM) technology for hot g…
Isolate the KAC Cf-252 Shuffler, Shuffler Instrumentation Cabinets, and Shuffler Room lighting and receptacles from all Electrical Power Sources an…
Safely remove from SRS property trailers 772-29G, 782-5G, and 782-10G. Safely demolish SRS property trailer 782-13G. Demolished trailer will be di…
A single partial can of Leak-Tec 72V was found during a review of the gloveboxes as part of the facility lay-up preparations. Waste removed from t…
SUD to paint various equipment sitewide. Scopes include cleaning, prepping and painting. …
Install compressed gas cylinder bottle rack outside of K-Disassembly Basin, 105-K…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer model…
Install a new chain link fence for the switchyard at SCE&G substation 72 (751-B).
SUD/Construction to paint air release valves on the river water system. Scopes include cleaning, prepping, and painting.…
Replace the tile and carpet in the 105-K Personnel Wing Ladies Restroom and Locker Room.…