Remove remaining floor tile from RBOF (Receiving Basin for Off-site Fuel) facility. Scope of work includes removing floor tiles, removing tile mast…
The proposed activity is to allow discharge of non-process HVAC chill water to the stormwater ditch that goes to the constructed treatment wetland …
Aqueous corrosion testing is performed for numerous materials in solutions composed of an array of chemicals. …
The Cyberex Inc Rectifier-Charger Model 130/106R3 is being replaced with the Hindle Power Station Float Battery Charger in Building 108-2K.…
719-N Prep and Paint 8 Concrete Bollards for High Visibility …
This Scope provides the labor, material, and services to install additional personnel office space and restroom for supporting new missions in K-Ar…
Pull sediment samples from settler tank for characterization and ultimate disposition.…
Replace boiler #3 in B39. Work includes removing existing boiler #3 including disconnecting all electrical and plumbing and installing new boiler i…
The project is sub-divided into two budget periods: BP1 is Bench-scale testing at Univ of ND and BP2 is a field test of technology at Milton R. You…
Mixed metal redox catalyst will be synthesized at the Ri (NC State University). The catalyst may contain heavy metals. The catalyst precursors ma…