B26 ground floor will be retrofitted from the main conference room down to the G22 area, carpet, lights, ceiling tiles, paint, etc. …
Remove and reinstall pressure relief valve SW-PRV-001 at 681-3G Pump House #3.…
The contents of the 607-18A Trade Waste Tank will be removed, and the remaining sludge of silver will be recycled as a precious metal rather than d…
Perform cleaning, seal coating, and restriping of parking lots in A-Area, B-Area, C-Area, and N-Area.…
Replace carpet in Building 751-1A, Room 17 using standard blue carpet squares.…
Due to the need for increased efficiency in accessing the Material Access Area (MAA), a modification for the 105-K Entrance Control Facility (ECF) …
This activity is for completing deactivation of the 236-H By-Product Facility. This facility includes the retired Burst Test Process, the He-3 Puri…
Installation of new domestic water piping in J and S-Areas.…
Since during operation of the 105-K KIS Vault uses compressed gas nitrogen and carbon dioxide as part of the process, potential gas leakage and asp…
Replace the existing metal halide and fluorescent lights in the K- Area 105-K building with LED Technology.…