Replace Trailer Space Roll Door Cover, North Side Purification. Door cover may contain asbestos/galbestos material and PCBs.…
This modification will replace the Electronic Safeguards and Security System (E3S) in the Tritium Extraction Facility (TEF) with the Lawrence-Liver…
Renovation of restroom in Building 710-14N.…
This EEC covers the operation of the AccuTOF-DART time-of-flight mass spectrometer. Investigation of inorganic and organic chemicals on the surface…
The Lab 106 will be modified to provide space for SRNL Analytical Services to perform clean reagent preparation when their organization moves from …
The proposed work will involve studying effectiveness of VCIs (Vapor Corrosion Inhibitors) in the presence of bacterial activity.…
Corrosion testing of stainless steel with simulated sea salt will be performed in 999-2W. …
H Area Construction Personnel will remove insulation from a steam trap so that leak repairs can be made to the piping.…
Install Multiquip Model DCA20SPXU4F (Serial# 7152346) Reciprocating Internal Combustion Engine (RICE) Unit (SRSR00594) at Tank 43H, H-Tank Farm.…
Award Number: DE-EE0008684CX(s) Applied: A9, B3.6, B5.1Building Technologies OfficeLocation(s): MNOffice(s): Golden Field Office