Bonneville Power Administration proposes to reconfigure the Fords Prairie Tap line, including the sectionalizing switches, near Chehalis, Lewis Cou…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing wooden H-frame structures along its Box Butte S…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to approve a request by Black Hills Corporation (Black Hills) to re…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine maintenance of the existing access roads along a…
This Categorical Exclusion covers routine renovation and maintenance activities of a general and repetitive nature which include installation, modi…
Award Number: DE-EE0006729CX(s) Applied: A9, B3.1, B5.3Geothermal Technologies OfficeLocation(s): HIOffice(s): Golden Field Office
The Falcon and Amistad Projects Firm Power Rate Formula will expire on June 7, 2019. Western proposes a 5-year formula rate extension through June …
Award Number: DE-EE0008634CX(s) Applied: A9Water Power Technologies OfficeLocation(s): CAOffice(s): Golden Field Office
The scope of work would involve the demolition of Buildings 04-020E, 04-024, 04-027, and 04-029. These facilities have been deemed excess to the Pa…
Bonneville Power Administration is proposing to obtain a conservation easement from the Confederated Tribes of Warm Springs for the Dunstan propert…