A subcontractor designed and constructed a permeable reactive barrier (PRB) in the subsurface to intersect volatile organic compound (VOC) contamin…
Replace the 50 ton chiller (T948-500-10) located inside of Building 249-H…
There are currently employees stationed at the 263-170H warehouse, which does not have any form of air conditioning. Swamp coolers are currently us…
Replace packing and unclog drain on cooling water supply pump 004 at 285-H.…
The Process Computer System (PCS) for the Function Test Station (FTS) is beyond its service life and needs to be replaced. Some of the components a…
This activity will modify the chemical feed system and associated concrete containment structures at the 789-B domestic water treatment plant.…
Repair walls, floor and seal roof of Trailers 735-10 and 735-9. Activities will require removal and replacement of damaged wood paneling, wall ins…
Emera Energy U.S. Subsidiary No. 1, Inc. (EE US No. 1 or Applicant) has applied to the Office of Electricity for an electricity export authorizatio…
Five office trailers and one bathroom trailer in L-area will be removed and replaced.…
This design change (M-DCF-K-00585) will replace the 216-B sump pump and the associated discharge piping. Due to the existing anchor bolts in the su…