The proposed work activity is to remove a recent modification from the Advanced Test Reactor (ATR) Control room air conditioner, 670-HVA-2. The mod…
The proposed action involves aerial application of bulk sagebrush seed to areas burned by the Sheep Fire in July 2019 by Thomas Helicopter, a com…
Award Number: DE-EE0008390, CX(s) Applied: A9, Wind Energy Technologies Office, Location(s): NY, Office(s): Golden Field Office
Award Number: DE-EE0008834, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): OH, Office(s): Golden Field Office
Remove receptacles and non-load-bearing wall, repaint walls, and replace carpet and baseboards in Building 773-63A, Rooms 10 and 11.…
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O-M Plan is not required.…
Install riprap on the upstream slope of Par Pond Dam between the existing riprap and the guard rail. …
This EEC covers all Site Services preventative and corrective maintenance work that has the potential to disturb presumed asbestos containingmateri…
Install Portable Heaters and Diesel Generators to Provide Temporary Heat For Y708 Project Tie-Ins…
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O-M Plan is required.…