Remove Ductwork in Front of Chiller Unit 004 in Building 785-6A. Subcontractor will repair/rebuild the Chiller Unit and replace ductwork.…
Construction will remove asbestos insulation and replace with non-asbestos insulation.…
A treatability study will be performed to inject natural artesian groundwater from two nearby production wells in D-Area into the upper water table…
Award Number: DE-EE0008080CX(s) Applied: A9, B3.6Fuel Cell Technologies OfficeLocation(s): CTOffice(s): Golden Field Office
Award Number: DE-EE0008695CX(s) Applied: A9, B3.6Building Technologies OfficeLocation(s): CTOffice(s): Golden Field Office
Perform cleaning, seal coating, and restriping of parking lots in C-Area (613-C, 613-1C, 613-2C). …
Install Wacker Neuson Model G-25 (Serial# 24367879) Reciprocating Internal Combustion Engine (RICE) Unit (SRSR00595) at 901-Z, Ronnie Scott's Hut…
Proposed activity is to dig 12 inches deep by approximately 12 inches in length and width beside the 285-H basin wall at the construction joint tha…
The River Water Pumphouse, 681-3G, utilizes an outdoor 8-ton gantry crane with local and remote pendent controls. The control panel was last replac…
Subcontractor will provide roof repairs on Building 618-G. The Subcontractor will not disturb the existing roof while performing these repairs on B…