Boiler preventive and corrective maintenance (PM/CM) on 735-1B Hot Water System, including removal of presumed asbestos containing material (PACM) …
The existing cubicles are original to the 730-B facility and have reached the end of their design life and will be replaced.…
Remove insulation from valve 806, so that packing can be adjusted. Valve is located in front of 736-A, SRNL.…
Replace wooden steam line support brackets with steel brackets in various locations in A-Area.…
Remove existing temporary scaffold-style handrail and replace with a permanent handrail.…
A Storm Water Visual Assessment Sample Holder (a.k.a Kremlin sleeve) is to be installed at outfall S-10A. …
Remove Ductwork in Front of Chiller Unit 004 in Building 785-6A. Subcontractor will repair/rebuild the Chiller Unit and replace ductwork.…
At the Scrap Lumber Pile 631-2G a DPT rig will collect soil samples to a depth of 10-ft at 19 locations. At the Ford Building (690-N) 27 hand aug…
Transport, Receipt, and Unloading of Samples from VC Summer. Rev. 2 Added returning samples to glass vials, where the vials will be subsampled usi…
The proposed action is to fully remove the existing roof system on building 292-F, Fan House, down to the existing metal deck and replace it. …