This activity will investigate the properties and degredation behavior of bulk and particulate polymers. The degradation will be induced using ligh…
Two rain shelters previously used as car-pool drop-off sheds (54-19G and 54-22G) are being re-purposed as designated smoking shelters and relocated…
This activity will replace the existing 152-K transformer with a pole mounted transformer, and leave the 152-K transformer abandoned in place.…
SRNL will dissolve stainless steel clad nuclear fuel using electrolytic dissolution.…
Install new 480V service at ATTA Range 7.…
Incorporation of a laser into the mixing extruder of a FDM 3D printer for additive manufactured parts.…
This Amended Determination follows approval of additional funds and project milestones. Additional funding will support the project team's small-sc…
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to remove the modular Alternate Control Center (ACC) building from i…
Bonneville Power Administration (BPA) proposes to sell about 0.27 acre of fee-owned land comprising the BPA Eagle Lake Substation to Big Bend Elect…
Subcontractor shall furnish all tools, equipment, transportation, labor, and supervision, required to perform the work in connection with the blast…