DE-FE0024233 Subtask 2.7-Wet ESP and Aerosol Testing at Coal Creek Station. Slipstream field capture studies.…
Increasing Affordability, Energy Efficiency, and Ridership of Transit Bus Systems through Large-Scale Electrification…
To remove the existing slab and installing a new concrete slab in the K9 Kennel Building. Installing a cinderblock wall in the center of the K9 kennel and install fencing around the K9 kennels.
To install a concrete containment slab in the WH drumyard with a curb and drain valves.
Conduct investigative and geotechnical activities in support of improvements and new construction for the Building 7 parcel project north of the le…
Plug and abandon well USBM/AEC CCH-3 and reclaim the site well pad and access road at the Bronco, Colorado, Site…
Construct eleven permanent aerial survey quality control monuments at the Grand Junction, Colorado, Uranium Mill Tailings Radiation Control Act Tit…
BPA proposes to perform an urgent in-kind wood pole replacement on Hawkins -Alvey No.1 structure 5-1.…
BPA proposes to perform repairs to Fairview-Rogue No. 1, Structure 54-2. …
BPA proposes to provide funds to the Grande Ronde Model Watershed for assessments that would inform future restoration implementation and action ef…