This proposed activity will employ H Canyon's Electrolytic Dissolver to process Fast Critical Assembly (FCA) material.…
Award Number: DE-EE0008955, CX(s) Applied: Multiple, Water Power Technologies Office, Location(s): WA, Office(s): Golden Field Office
BPA proposes to perform routine maintenance on the Timber Tap transmission line access roads.…
Demolish existing electrical interconnect and install a pre-fabricated enclosure, switchgear, switching station, and support equipment.…
BPA proposes to provide funds to the Yakama Nation for monitoring, evalutation, and operation and maintenance activities.…
The purpose of this revision is to capture the addition of 2 new water tanks (T1 and T2) and a hose, which will be placed next to the USGS-102 well…
The US Department of Energy (DOE) proposes to modernize and expand the capacity of the LawrenceBerkeley National Laboratory (LBNL) Grizzly Peak Sub…
Subcontractor will provide roof replacement at Building 722-A.…
This activity involves the determination of Plutonium (Pu) and Neptunium (Np) in aqueous samples via the Control Potential Coulometry methodin 773-…
This EEC applies to the cleaning, cutting and dissolution of Plutonium (Pu) metal.…