Replace the packing in Return Pump #3 at 281-2H.…
Building 616-G has reached an end state and will be demolished.…
Subcontractor will provide roof repairs at 704-16B.…
Augusta Industrial to pressure wash internal cooling tower basins at 785-1B and 785-A.…
Install backboards in phone room in 722-A.…
The proposed action relocates electrical equipment and outlets, work benches, cabinets, and equipment and removes a 14-foot sheetrock partition wa…
The project will leverage existing design and analysis knowledge for additive materials and methods to develop and refine designs for advanced turb…
Remove the existing B6 HPCF air preheater and replace with an in-kind preheater at the same location. The location is the North side of B6 approxi…