Remove building 707-11F and dispose in C&D Landfill.…
Award Number: DE-EE0009129, CX(s) Applied: A9, B3.6, Advanced Manufacturing Office, Location(s): WA, Office(s): Golden Field Office
Award Number: DE-EE0009126, CX(s) Applied: A9, B3.6, Advanced Manufacturing Office, Location(s): IA, Office(s): Golden Field Office
BPA proposes to interconnect a new Benton Rural Electric Association substation (Ruppert Road Substation) at a new tap point on BPA’s existing Red …
Install Universal Wiring, UW, in Building 730-1B.…
Overhaul of Shone Ejector number 2 located at 607-2A.…
The Forest Service will prepare a design for and complete necessary repairs to the approach to Bridge No. 603-41G.…
The ICW Booster Pump and motor need to be replaced due to age.…
Repair and replace ledger board, drip edge and gutters on 292-2F and 294-2F.…
Replace steps and decking at 235-11F.…