The On-Dock Rail (ODR) straddle carrier will be dismantled and removed from the SRS.…
645-1N, Replace flooring and pre and paint walls.…
As part of the multi-facility wide effort for the MEDE project, an initial quantitative analysis of selected elements will be tested to verify no r…
The Hot Fuels Dissolution Apparatus (HFDA) located within the hot cell of the Hot Fuels Examination Facility (HFEF) requires the headplate to be mo…
The Nuclear Materials Discovery and Qualification Initiative (NMDQi) is focused on implementing advanced materials science research and development…
Development of a Heavy-Duty Direct-Injection Spark-Ignition Natural Gas Engine…
Perform repairs and safety enhancements on an overhead bridge crane. …
Subcontractor will provide roof repairs at 731-N.…
Remove the solenoid valve which controls the plant air system regulator.…
Each of the two Work Orders covers the replacement of a Safety Steam Relief Valve.…