Idaho National Laboratory (INL) uses shielded containers, including the Hot Fuel Examination Facility (HFEF)-5 cask and HFEF-14 cask, to transport …
BPA proposes to install conductor between BPA’s Biglow Canyon-John Day No. 1 transmission line and PGE’s Biglow Canyon substation, acquire equipmen…
BPA proposes to fund a portion of the Kalispel Tribe’s ongoing nonnative fish suppression and/or eradication efforts in areas of the Pend Oreille s…
BPA proposes to fund the Confederated Tribes of the Warm Springs Reservation of Oregon (CTWS) to implement the Dead Cow Wood Placement project.…
Award Number: DE-EE0007819, CX(s) Applied: A9, B3.6, B5.15, Water Power Technologies Office, Location(s): WA, Office(s): Golden Field Office
Award Number: DE-EE0009451, CX(s) Applied: A9, A11, Water Power Technologies Office, Location(s): OR, Office(s): Golden Field Office
Award Number: DE-EE0009363, CX(s) Applied: A9, Solar Energy Technologies Office, Location(s): CT, Office(s): Golden Field Office
Award Number: DE-EE0009341, CX(s) Applied: A9, B5.15, Solar Energy Technologies Office, Location(s): NY, Office(s): Golden Field Office
BPA is planning on improving and reconstructing approximately 6 miles of existing access roads along the Hilltop-Warner No. 1 230-kilovolt (kV) hig…
Powdered materials for use in additive manufacturing (3-D printing) will be mixed using the Turbula mixer in 999-1W.…