In order to ensure the reliability of the HVAC Supply Air System to support the Tritium Mission, it has been decided to perform a major overhaul of…
Defense Waste Processing Facility (DWPF) removal and replacement of Regulated Drains Collection Tank (RDCT) Sump Pump.…
703-1B Room E56 Replace Door and Frame.…
This activity is to remove presumed asbestos insulation from the 12.3 to 13.1 moisture separator and P-Trap.…
Routine electrical and mechanical fabrication, assembly, testing, installation, operation, and maintenance activities performed by R and D Engineer…
Hands-on fabrication activities covering the assembly of equipment and systems designed by the Energy Security and Engineering Department for SRNS,…
781-A has been has been renovated to accommodate the projects previously being completed in 305-A.…
The objective of this study is to better understand the mechanisms of iodine attenuation in wetland soils.…
Replace 19 wooden structures along transmission line 3017 with steel structures and structural components in an area of annual flooding. …
The Metallic (M) fuel experiments utilizes a newly developed sodium environment module termed the Temperature Heat sink Overpower Response (THOR) m…