BPA proposes to upgrade substation equipment and associated reconfiguration of some transmission lines’ approach and termination connection to the …
The project would install a new septic system (septic tank and drain field) at the MFC-721 Transient Reactor Test (TREAT) office building.…
BPA proposes to provide system reliability by replacing old and worn spacer dampers on the Broadview-Garrison No. 2 transmission line at transmissi…
BPA proposes to integrate a small generation project into its balancing authority (BA) in response to a request from Snohomish Public Utility Distr…
BPA proposes to fund the Confederated Tribes of the Warm Springs Reservation to implement the West Fork Redhill Phase 3 Wood Placement to restore a…
BPA proposes to upgrade its VHF radio system at the North Bend Radio Station by installing a new VHF whip antenna at the top of the station’s exist…
Building 201 - Demolish existing A/C foundations and bollards for units CU-3, CU-4, and CU-1. Building 202 - Demolish air handling system CCUC-19, a packaged air conditioning unit mounted on wood beams on grade. ...
In cooperation with Idaho National Laboratory (INL) and the Georgia Technical Research Institute, the US Army Engineer Research and Development Cen…
The objective of this project is to assist in the design analysis and execution of fuel (UO2) and cladding (SiC/SiC) irradiation testing at the con…
Provide support to DOE for the scientific, logistical and operational planning, operations, and analysis of the technical results of the Alaska Nor…