Western Area Power Administration prepared an EA that analyzes the potential environmental impacts of interconnecting a proposed photovoltaic solar facility adjacent to Western’s existing Midway Substation in El Paso County, Colorado.
Additional information is available at https://www.wapa.gov/regions/RM/environment/Pages/Front_Range-Midway_Solar_Interconnection_Project.aspx.