Subcontractor shall provide all labor, tools, equipment, transportation and supervision, as required to cut trees, brush and grass from approximately 10-mile-long by 50 feet wide of Pipeline Right of Way.
Subcontractor shall provide all labor, tools, equipment, transportation and supervision, as required to cut trees, brush and grass from approximately 10-mile-long by 50 feet wide of Pipeline Right of Way.