At Alcoa’s expense, the Bonneville Power Administration proposes to replace fourteen conductor hardware assemblies for seven low voltage feeders (2 at each feeder) at the Intalco aluminum plant owned by Alcoa. All work would be completed within Alcoa’s existing graveled substation yard and no ground disturbance would occur. Not all pot lines are in service and Alcoa would have no problems re-routing power during the short outages needed for the replacement work at each feeder.