Summary
Western Area Power Administration (WAPA) is preparing this EA to evaluate the environmental impacts of reconstructing the PAD-BLY#2 transmission line within its existing 100-foot-wide right-of-way (ROW) to improve overall system reliability and safety and to better meet future transmission needs.
Additional information can found on the WAPA project website.