PBI-25 Remove Out of Service Overhead Supervisory Control and Data Acquisition (SCADA) Lines and Accessible Poles from Station 52 to R-Area, from R…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform deactivation, dismantling, and removal of electric transmission facil…
The proposed project activity is focused on replacing overhead power grid lines with underground conduit and 3-phase wire. Some overhead wire is cu…
Purpose: To ensure the safety and reliability of the bulk electric system.…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
Rebuild nearly six miles conductor electric service lines and replacing aged and damaged poles, change out 8 controls, and relocate 1.2 miles of li…
The project will upgrade three 4 kV circuits to more dependable 12 kV circuits, with replacement of poles, hardware, and transformers that have rea…
Replacement of old poles (28), 13 transformers, 2250 ft of No. 1/0 acsr and 1350 ft of No. 4/0 acsr.…
The U. S. Department of Energy (DOE), Richland Operations Office (RL), Infrastructure and Services Division (ISD) proposes to modify the 13.SkV ele…